Knowledge
Practical information about choosing, understanding, operating and maintaining generators.
Frequently asked questions
Answers to common questions about choosing and using generators.
What generator capacity should I choose?
The generator should be able to run all essential equipment at the same time, with approximately 20–30% reserve capacity. List the equipment you intend to use, add up its power demand and apply a reserve factor. If in doubt, ask a technician to assess the site.
How do standby and prime generators differ?
A standby generator operates when the utility supply fails and typically runs for relatively few hours per year. Prime/continuous generators can operate for extended periods and are suitable when used as the main power source or on a regular basis.
Should I choose a locally assembled or an imported generator?
Locally assembled generators can offer a lower price, convenient maintenance and readily available parts. Some imported models offer a higher level of finish. The choice depends on your budget, technical requirements and after-sales support.
What is generator synchronization, and when is it needed?
Synchronization connects multiple generator sets so that they operate in parallel as one system. It is useful when you need greater capacity, higher reliability or the flexibility to expand capacity later.
What do ATS and AMF do?
An ATS (Automatic Transfer Switch) transfers the load from the utility supply to the generator during an outage and back when utility power returns. AMF is the control function that starts and stops the generator automatically.
How often does a generator need maintenance?
Maintenance is usually scheduled by operating hours or every 3–6 months, depending on usage. Keeping to the maintenance schedule helps ensure stable operation and a longer service life.
Should I rent a generator rather than buy one?
Renting suits temporary use, uncertain long-term requirements or situations where you want to avoid the initial investment and maintenance responsibilities. Buying can be more economical for regular, long-term use.
How long do delivery and installation take?
In-stock generators are generally delivered within a few days to one week. Made-to-order units may take 2–6 weeks depending on the configuration. Installation typically takes 1–3 days, depending on the scale of the system.
What warranty does NHSTAR provide?
Generators are covered in accordance with the engine manufacturer’s standards and NHSTAR’s terms. The specific warranty period is stated in the contract and warranty documentation provided at handover.
Is technical support available 24/7?
Yes. NHSTAR maintains a technical team ready to assist customers with issues outside normal business hours.
Choosing a generator
Assess your requirements and choose a suitable generator configuration.
How to calculate generator capacity for your needs
Add up the power demand of equipment that will run simultaneously, then apply a reserve factor of 1.2–1.3. For equipment with high starting demand, such as compressors or lifts, account for starting current to avoid overloading the generator.
Factors to consider when choosing a generator
Consider capacity, load type (resistive or inductive), installation environment (indoors or outdoors), permitted noise level, future expansion and budget.
Should I choose a single-phase or three-phase generator?
Single-phase generators suit households and small offices. Three-phase generators suit factories, workshops and sites with industrial equipment.
Soundproof canopy versus open generators
A soundproof canopy substantially reduces noise and suits residential areas, hospitals and hotels. Open generators cost less and are typically used in production areas or locations with fewer noise restrictions.
Choosing generators for factories, hospitals, data centers and construction sites
- Factories: Prioritize prime-rated generators and the ability to expand capacity.
- Hospitals: High reliability, fast starting and an ATS are important.
- Data centers: Strict requirements apply to stability and parallel operation.
- Construction sites: Rental or mobile generators are often preferred.
Technical knowledge
Understand system principles and the key specifications in a catalogue.
How does generator synchronization work?
The generator sets are connected and controlled so that voltage, frequency and phase angle are synchronized before they connect to a common busbar. Once synchronized, they share the load automatically.
ATS/AMF systems and automatic power transfer
The ATS switches between power sources. AMF controls automatic generator starting when utility power fails and stopping after the utility supply has stabilized.
Key specifications to check in a generator catalogue
Check rated capacity (kVA/kW), power factor, fuel type, fuel consumption, noise level, ingress protection (IP) rating and operating rating (standby/prime).
Understanding power factor and its effect on generator selection
Most generators are rated at a power factor of 0.8. A load with a lower power factor reduces the usable real power available, so it needs to be considered carefully when sizing a generator.
Standby versus prime ratings
- Standby: Backup operation with limited annual operating hours.
- Prime: Extended operation with a varying load.
Operation & maintenance
Operate your generator correctly, monitor its condition and plan maintenance.
Generator maintenance schedule
Basic daily or weekly checks generally cover oil level, coolant and the battery. Detailed servicing is typically scheduled every 250–500 operating hours or every 3–6 months.
Important points for first-time operation
Check oil, coolant, the battery and the fuel system. Start without load, then increase the load gradually. Monitor temperature, oil pressure and voltage.
Checks before starting a generator
Check the intended load and fuel consumption levels, engine oil, coolant, fuel, battery condition, belts and electrical connections.
Common faults and basic troubleshooting
Common issues include failure to start, voltage drops, overheating and sensor alarms. Many are associated with the battery, fuel supply, air filter or sensors.
How to estimate generator fuel consumption
Fuel consumption depends on the load. Manufacturers typically publish consumption at 25%, 50%, 75% and 100% load. These figures can be used to estimate consumption.
Operating in harsh weather conditions
Consider ambient temperature, humidity and dust. Ensure adequate ventilation and choose equipment with a suitable protection rating.
Advanced solutions
Explore solutions for larger power systems and future expansion.
When should multiple generators operate in parallel?
Consider a synchronized system when demand exceeds the capacity of a single generator, higher reliability is required so other sets can keep running if one fails, or investment is planned in phases.
Generator trends in industrial parks and data centers
More factories, industrial parks and data centers are requiring power systems with high reliability.